JSC «Moynak HPP n. a. U.D. Kantayev»

Performance indicators

Main characteristics of Moynak HPP

  • Type of power plant: dam-diversion 
  • Electrical power, MW: 300

Characteristics of equipment

  • Number and brand of turbines: 2
  • Number and brand of generators: 2
  • Capacity of generators, MW: 2 × 150

Main facilities

  • Type of dam: rockfill
  • Dam height, m: 94
  • Floodgate: none
  • Open switchgear: 220 kV

Facts

Headwork of Moynak HPP includes rockfill dam with height of 94 m, water discharge unit and water intake unit of diversion. The dam forms Bestyubinsk water basin with area of 10 sq.m., total capacity of 238 mln.m³, useful - 198 mln.m³.

  • 94 meters is the length of the dam
  • 500 meters is water head
  • 9200 meters is the length of the diversion tunnel
  • 560 centimeters is the diameter of tunnel pipes
  • It takes 2 minutes for start and restart of generators
  • 238 million of cubic meters is the volume of Bestyubinsk water basin

Main characteristics of Moynak HPP

  • Type of power plant: dam-diversion 
  • Electrical power, MW: 300

Characteristics of equipment

  • Number and brand of turbines: 2
  • Number and brand of generators: 2
  • Capacity of generators, MW: 2 × 150

Main facilities

  • Type of dam: rockfill
  • Dam height, m: 94
  • Floodgate: none
  • Open switchgear: 220 kV

Facts

Headwork of Moynak HPP includes rockfill dam with height of 94 m, water discharge unit and water intake unit of diversion. The dam forms Bestyubinsk water basin with area of 10 sq.m., total capacity of 238 mln.m³, useful - 198 mln.m³.

  • 94 meters is the length of the dam
  • 500 meters is water head
  • 9200 meters is the length of the diversion tunnel
  • 560 centimeters is the diameter of tunnel pipes
  • It takes 2 minutes for start and restart of generators
  • 238 million of cubic meters is the volume of Bestyubinsk water basin


Performance indicators Performance indicators
Prospect of the Republic 50/2 010000 Astana Akmola region Kazakhstan